摘要:3.1 Annual Report of SPR Operation Chu Shaochu Having overseen by National Nuclear Safety Administration and specialists, the reactor restarted up successfully after Safety renovation on April 16, 1996. In August 1996 the normal operation of SPR was approved by the authorities of Naitonal Nuclear Safety Administration. 1 Operation status In 1996, the reactor operated safely for 40 d and the energy released was about 137.3 MW·d. The operation status of SPR is shown in table 1. The reactor started up to higher power (power more than 1 MW) and lower power (for physics experiments) 4 times and 14 times respectively. Measurement of control rod efficiency and other measurement tasks were 2 times and 5 times respectively.